The boiler has had a hydraulic test with new certification issued, the chassis runs on air in desultory fashion, it would likely be better under steam.
The engine needs some work, including a replacement pressure gauge and meths pipe between locomotive and tender, as well as servicing the hand pump and clack valve.
Complete with wooden carrying box.
| gauge | Gauge 1 & smaller |
| length/inches | 13 + 11 |
| width/inches | 4 |
| height/inches | 6 |
| weight/kg | 10 |
| boiler number | 200302 |
| CE mark | n/a < 2 litre capacity |
| boiler type | spirit fired |
| boiler material | copper |
| boiler construction | silver soldered |
| hydraulic test valid to | 25-Jan-2027 |
| safety valve(s) | 1 |
| safety valve type | spring |