The professionally built copper boiler requires piping up and fitting out - material is included for the stainless steel grate. The brake shoes and hangers are fitted but require rodding up. The remainder is platework - running boards, cab and boiler cladding.
The tender is complete and fitted with compensated brakes.
There is a complete set of drawings with the engine and a box of sundry parts including mechanical lubricator.
All up weight is around 5 cwt, overall length just under seven feet with tender.
gauge | 7 1/4 inch |