A new, unsteamed Chub, by the same builder as the
Tich currently in stock. The engine has been built to a good standard and
is complete boiler has had a twice pressure hydraulic test and is sound, the
engine has been run on air.
Silver soldered copper boiler with three element
superheater, 80psi working pressure, feed by twin axle and hand pumps.Gunmetal
cylinders with slide valves actuated by Walschaerts gear, pole reverser in
cab. Mechanical lubricator.
The engine requires some work to finish, including making front buffers, painting and packing glands on cylinders and fittngs.
Hydraulic test 3-3-2011 @160psi for 80psi working pressure
gauge | 5 inch |