Work to date comprises a rolling chassis complete with cylinders; valve gear machined and fitted including eccentric straps and sheaves, rods and expansion links; a silver soldered copper boiler and a complete and painted tender.
Boiler has had a twice working pressure hydraulic test with certificate issued for same.
Complete with a quantity of parts, including laser-cut platework for cab and running boards; name and cabside plates; finely detailed cab fittings including water gauge and brake valve; TIG-welded stainless steel superheater elements and a smokebox assembly complete with front ring, door and chimney.
The engine has come to us with a large collection of documentation and literature, including copies of construction articles, DVDs featuring the full-sized engines, builder's photographs of construction to date inclding the boiler
| gauge | 5 inch |
| length/inches | 37.5+26 |
| width/inches | 10 |
| height/inches | 9 |
| wheel material | cast iron |
| cylinder material | cast iron |
| working pressure/psi | 90 |
| hydraulic test valid to | 22/Jan/2024 |