The boiler has never been fired and is blanked up ready for hydraulic test - an initial squeeze showed a multiplicity of leaks, it will require work or replacement, depending on your facility with a propane torch.
| gauge | 5 inch |
| length/inches | 40 + 25 |
| width/inches | 11 |
| height/inches | 15 |
| weight/kg | 100 |
| wheel material | cast iron |
| axlebox type | split bronze |
| cylinder material | cast iron |
| valve gear | Walschaerts |
| reverser type | screw |
| CE mark | n/a non-commercial |
| working pressure/psi | 90 |
| boiler type | locomotive |
| boiler material | copper |
| boiler construction | silver soldered |