The engine is complete and turns over freely, the commercially built boiler by Chambers has had a hydraulic test with certification issued for same - we would warranty as sound.
Work required includes:
| gauge | 5 inch |
| length/inches | 41 + 26 1/2 |
| width/inches | 10 |
| height/inches | 14 1/2 |
| weight/kg | 62 + 21 |
| wheel material | cast iron |
| axlebox type | split bronze |
| cylinder material | cast iron |
| valve gear | Stephensons |
| reverser type | screw |
| lubricator type | 2 x mechanical |
| injector(s) | 1 |
| boiler number | RC.858 |
| year built | unknown |
| boiler maker | R Chambers |
| CE mark | n/a - pre-2002 |
| working pressure/psi | 90 |
| boiler type | locomotive |
| boiler material | copper |
| boiler construction | silver soldered |
| hydraulic test valid to | 26-Apr-2025 |
| superheater(s) | 2 |
| superheater type | radiant |
| fusible plug | no |
| safety valve(s) | 2 |
| safety valve type | spring |
| hand pump | yes |
| whistle | yes |