Work to date is to a high standard, fit and finish of machined parts is good.
Complete with copy of the construction manual and several sheets of drawings.
gauge | 3 1/2 inch |
boiler number | 482.3.93 |
year built | 1993 |
CE mark | n/a, pre-2002 |
working pressure/psi | 80 |
boiler type | locomotive |
boiler material | copper |
boiler construction | silver-soldered |
superheater(s) | 3 |
superheater type | flue tube, stainless steel |