Work to date is to a high standard, fit and finish of machined parts is good.
Complete with copy of the construction manual and several sheets of drawings.
| gauge | 3 1/2 inch |
| boiler number | 482.3.93 |
| year built | 1993 |
| CE mark | n/a, pre-2002 |
| working pressure/psi | 80 |
| boiler type | locomotive |
| boiler material | copper |
| boiler construction | silver-soldered |
| superheater(s) | 3 |
| superheater type | flue tube, stainless steel |