Work to date looks well done, the tender body is particularly nicely formed and riveted.
Boiler is part assembled, tubes soldered into firebox tubeplate, outer wrapper extended with coppersmiths joints either side.
Complete with some proper old-fashioned blueprints!
gauge | 3 1/2 inch |
length/inches | 22 + 16 |
wheel material | cast iron |